This week, the outcome of the commission of inquiry has been released. The key points are as follows:
- Blasting of the cliff during the construction of the apartment block was responsible for the failure;
- This blasting, which was intended to create the platform for the building, weakened the hillslope;
Presumably the blasting removed the toe of the block, destabilising it. If so then this looks to be an error of the site investigation and design. Given that the report has been handed over to Ministry of Justice, I would imagine that those involved in the original work will be somewhat uncomfortable now.
thanks this was so useful for my geography a level. you're the best!
ReplyDelete